Commissioning and handover
Commissioning standards help define how roles, checks, sequencing and acceptance should be managed before a system is handed over.
North Current uses that orientation to test whether handover evidence still connects to the live system: controller strategy, point naming, trends, alarms, meters, user access and acceptance records.
Evidence checks
- Commissioning records match the current installed state
- Witnessed tests are tied to operating sequences and trend evidence
- Known defects, concessions and deferred works are visible to operators
References
CIBSE Commissioning Code M: Commissioning Management, July 2022
A practical reference for commissioning planning, responsibilities, documentation and acceptance management across building services projects.